Timeline
Timeline
Spring Quarter Timeline (VIS 160A)
Week 3: April 14 — Proposal & Planning
-
Final Project Proposal + Initial Timeline
-
Finalize concept, aesthetic direction, and core interactivity
-
Outline symbolic elements (feathers, deity representation, etc.)
-
Begin sourcing materials (wood, sensors, motors, feathers)
Week 4: April 21 — Initial Prototyping & Layout
-
Create rough layout for feather bundles and motor placements
-
Begin wiring diagram and sensor configuration tests
-
Prototype motor response using basic touch or ultrasonic input
Week 5: April 28 — Wiring & Single-System Testing
-
Test single motor with one sensor and feather bundle
-
Finalize feather types, quantities, and attachment strategy
-
Refine website (add process page and timeline)
Week 6: May 5 — Midterm Checkpoint
-
Midterm Presentation: Working Prototype + Sketches
-
Present functioning motor + sensor demo
-
Share updated website and installation sketch
-
Confirm motor mounting strategies
-
Known: Basic interactivity + LED behavior
-
Unknown: Mechanical system/final layout
Week 7: May 12 — Multi-System Integration
-
Begin integrating additional sensors and motors
-
Map sensor inputs to corresponding feather movements
-
Install RGB LED strips and test synchronized behaviors
-
Refine aesthetic flow and layout spacing
Week 8: May 19 — Physical Assembly Begins
-
Deliverable: Mounted structure with partial interactivity
-
Begin mounting feathers and attaching sensors
-
Assemble and mount motors to wooden frame
-
Address light diffusion and touch responsiveness
-
Continue adding content to website (video, photos)
Week 9: May 26 — Final Build & Testing
-
Complete full integration of sensors, motors, and LEDs
-
Debug interaction issues and finalize code behavior
-
Conduct 24-hour testing for consistency
-
Prepare final website updates and visual documentation
Week 10: June 2 — Final Presentation
-
Deliverables: Fully Assembled & Functional Installation + Website
-
Refine all behaviors and structural balance
-
Complete website (concept, visuals, system overview, process)
-
Present project in exhibition-ready format
Summer Session Timeline (VIS 160B: June 30 – August 1)
Week 1: June 30 — System Revisions & Polishing
-
Address structural flaws or interactivity issues from spring
-
Test and refine sensor sensitivity, motor torque, LED feedback
-
Strengthen feather suspension mechanics
Week 2: July 7 — Expanded Behavior & Final Logic
-
Add layered behaviors (e.g., longer movement sequences or light fades)
-
Polish transition between motor states
-
Prepare text for final paper (introduction, methods, reflection)
Week 3: July 14 — Documentation & Accessibility
-
Photograph final build in installation space
-
Record interaction video for website
-
Add accessibility features (alt text, high contrast design, etc.)
-
Continue final paper draft
Week 4: July 21 — Final Website & Paper
-
Final Reflective Paper Due
-
Finalize all written sections of website
-
Submit full paper draft (conceptual context + technical explanation)
-
Upload walkthrough video and installation images
Week 5: July 28 — Final Submission
-
Locked Website + Final Presentation
-
Submit finished project (website, paper, documentation)
-
Deliver final walkthrough of installation and interactivity
-
Reflect on process and publish